Main result--
Materials--
Estimated cost--
EasyCalc4UPea Gravel Calculator helps turn real measurements into a practical planning estimate before ordering material or scheduling work. Use it for early budgeting, then confirm product yield, supplier units, delivery limits, and local requirements.
Main result--
Materials--
Estimated cost--
Use this pea gravel calculator for patios, walkways, dog runs, drainage areas, play spaces, garden paths, and decorative beds. Pea gravel is rounded and comfortable underfoot, but it shifts more than angular crushed stone, so depth, edging, and use matter.
Cubic feet = length x width x depth in feet.
Cubic yards = cubic feet / 27.
Cubic yards with waste = cubic yards x (1 + waste percentage).
Tons = cubic yards with waste x density in tons per cubic yard.
Cost = tons x price per ton.
A 14 ft by 10 ft side yard covered 2 inches deep uses about 23.3 cubic feet, or 0.86 cubic yards before waste. With 10% waste, plan about 0.95 cubic yards. At 1.40 tons per cubic yard, that is about 1.33 tons. At $72 per ton, the material estimate is about $96 before delivery.
Use the Pea Gravel Calculator result as a starting quantity, then convert it into the way your supplier actually sells the material. Some stores sell by bag, each, pallet, strap, ton, cubic yard, or delivered load. Ask whether the quoted price includes delivery, fuel surcharge, pallet deposit, short-load fee, tax, unloading limits, or return rules. For outdoor projects, also check access for trucks, where material can be staged, whether the ground is firm enough for delivery, and how long the work area can stay open if weather changes.
For a safer order, write down the measurements used in the calculator, the waste percentage, the product size or density, and the final rounded quantity. Bring those notes to the supplier or contractor so they can catch unit mistakes before money is spent. If the project affects drainage, support, vehicle traffic, steps, walls, posts, or anything inspected by code, treat the calculator as a planning aid and verify the final material list with a qualified local source.
This is a planning estimate. Follow local drainage guidance, supplier density information, accessibility needs, and professional recommendations where gravel affects walking safety, runoff, or structural base performance.
Many decorative paths and beds use about 2 inches, while patios or dog runs may need a different section depending on base and use.
It is usually not the best surface for driveways because rounded stones move under tires. Angular crushed stone is often better.
It varies by moisture and source. A planning value around 1.3 to 1.5 tons per cubic yard is common, but ask your supplier.
Fabric can help separate soil from gravel, but drainage, slope, and maintenance still matter.
Usually bulk is cheaper for larger areas, but bagged gravel can make sense for small spots or limited access.